Can I configure the claim phases so that they run two in parallel, that is, they start on the same date?
- claim phase with an allow list at 0.3 eth for 100 NFT
- another claim phase with an allow list at 0.1 eth for 200 NFT
Can I configure the claim phases so that they run two in parallel, that is, they start on the same date?
gm! This isn’t supported at this time, the phases will need to be run after each other.